FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 5,862 results were found for @Y in 0.157 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 20 of 294  >> 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29   Next >>
 
381. Id fs erfo 2017(2)-28(1), boise repairs 2017 - bid opening summary
Bid Opening Summary
Type: MOD | Date: Jun 07, 2018 | Location: 98661-3801 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
382. Motco repairs to bridges t-1, t-2, t-5 and t-6 - draft plans and specifications
There are no significant changes anticipated to the draft plans and specifications.
Type: MOD | Date: Jun 07, 2018 | Location: 95814 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
383. Pl84-99 levee system 0561 (north) levee improvement construction project - site visit q&a
Site Visit Questions and Responses. Note that all other questions (i.e., bidder inquiries) must be submitted as stated in the solicitation - via ProjNET.
Type: MOD | Date: Jun 07, 2018 | Location: 95814 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
384. Improve family housing - north foster towers - draft specs
DRAFT DRAWINGS Vol 2 - FOR INFORMATIONAL AND PLANNING PURPOSES ONLY DRAFT DRAWINGS Vol 1 - FOR INFORMATIONAL AND PLANNING PURPOSES ONLY DRAFT SPECIFICATIONS - FOR INFORMATIONAL AND PLANNING PURPOSES ONLY Sources Sought Market Survey W912HV-18-Z-0013 Impro...
Type: MOD | Date: Jun 07, 2018 | Location: 96338-5010 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
385. Fy18 st. louis river aoc slip 3 and slip c remedial cap - w911xk18b0007 - plans slip c - specifications - package #4
PLANS SLIP 3 SPECIFICATIONS PLAN SLIP C W911XK18B0007 FY18 St. Louis River AOC Slip 3 and Slip C Remedial Cap The scope of work requires the contractor to provide all work, materials, equipment, labor, supervision, management, and administration to constr...
Type: PRESOL | Date: Jun 07, 2018 | Location: 48226 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
386. L455 levee raise
L455 Levee Raise near St. Joseph Missouri The U. S. Army Corps of Engineers, Kansas City District, intends to issue a solicitation for a Firm Fixed Price Construction contract for Levee work to raise the mainstream levee less than or equal to 2.5 feet in ...
Type: PRESOL | Date: Jun 07, 2018 | Location: 64106-2896 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
387. P4041 medical/dental replacement, marine corps base camp lejeune, north carolina
This notice does NOT constitute a request for proposal, request for quote, or Invitation for bid. The intent is to notify potential offerors of a proposed contract action. A sources sought notice was posted on 14 December, 2017 under synopsis N4008518R061...
Type: PRESOL | Date: Jun 07, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
388. Minish park 3a
The project has been postponed. Pre-solicitation will be reposted at the time when it is determined the Government will proceed with this project.
Type: PRESOL | Date: Jun 07, 2018 | Location: 10278-0090 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
389. Buffalo national river project ar erfo buff 2015-1(1) - synopsis
Synopsis Sealed bids from certified Small Business Concerns only will be accepted for the Buffalo National River Project AR ERFO BUFF 2015-1(1), Solicitation Number 693C73-18-B-000026, located in Newton County, Arkansas. The project consists of the reloca...
Type: PRESOL | Date: Jun 07, 2018 | Location: 20166 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
390. Lock and dam tow rail design and replacement
The St. Paul District is planning to solicit for the design and construction of new tow rail systems for up to six (6) of our lock and dam sites on the Mississippi River. It is the Districts intent to select the contractor via a two-step design build proc...
Type: PRESOL | Date: Jun 07, 2018 | Location: 55101-1678 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
391. Security fence install - package #1
Contract Clauses Wage Determinations under the Service Contract Act SOW Requirement to provide and install 2943 linear feet of security fence IAW attached SOW
Type: PRESOL | Date: Jun 07, 2018 | Location: 27909-6404 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
392. Mission training complex, shaw afb, sumter, south carolina
Mission Training Complex, Shaw AFB, Sumter, South Carolina The Naval Facilities Engineering Command Southeast (NAVFAC SE) has been tasked to develop, solicit, and award a single-award, firm fixed-price (FFP), design-bid-build (DBB) contract for the constr...
Type: PRESOL | Date: Jun 07, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
393. Construction projects nvzr062031 and nvzr132003 macdill afb
This invitation is canceled in accordance with Federal Acquisition Regulation (FAR) 14.404-1(c)(6) and 14.404(e)(2). All otherwise acceptable bids received are at unreasonable prices and funds were not made available. Bids expired, therefore the requireme...
Type: PRESOL | Date: Jun 07, 2018 | Location: 32085-1008 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
394. Commissary addition and alteration at nas pensacola, florida
This solicitation HDEC03-18-R-0003 is being cancelled and replaced with HDEC03-18-R-0007
Type: PRESOL | Date: Jun 07, 2018 | Location: 78236-1039 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
395. Trinity center boat launch facility improvement
**PLEASE READ: THIS IS A PRE-SOLICITATION NOTICE. NO OTHER INFORMATION IS AVAILABLE UNTIL THE SOLICITATION IS ISSUED ON THE DATE IDENTIFIED BELOW** Solicitation Documents: The solicitation will be issued as a Request for Proposal (RFP) requiring both pric...
Type: PRESOL | Date: Jun 07, 2018 | Location: 96002 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
396. Xgfg132020 add/alter building 404 truax angb madison wi

Type: AWARD | Date: Jun 06, 2018 | Location: 53704-2591 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
397. Fy18 sabin dam removal, boardman river restoration, traverse city, mi.

Type: AWARD | Date: Jun 06, 2018 | Location: 48226 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
398. 36c26118b0375| project 612-18-428 | replaces flooring bldg 722 renovation| mather, ca - amendment 2

Type: FILE | Date: Jun 06, 2018 | Location: 95655 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
399. Project # 538-115 resolve safety/privacy/environmental issues on mental health unit, building 26 vosb set-aside chillicothe vamc - chillicothe, oh - amendment 3

Type: FILE | Date: Jun 06, 2018 | Location: 43219 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
400. Epoxy floor system - attachment
FBO Description: Epoxy Floor System (with color and texture samples) RFP/RFQ due: 6/20/2018 10:00AM Network Contracting Office Dany Humphreys Building 29 Hudson Valley Healthcare System 2094 Albany Post Road Montrose, NY 10940
Type: FILE | Date: Jun 06, 2018 | Location: 10548 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
<< Previous  Page 20 of 294  >> 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29   Next >>