FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 7,701 results were found for @Y in 0.108 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 17 of 386  >> 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26   Next >>
 
321. Giww - gulf intracoastal waterway, inner harbor navigation canal lock, southwest guide wall and dolphin replacement - phase i, orleans parish - amendment 3
AM0003 GIWW &ndash; Gulf Intracoastal Waterway, Inner Harbor Navigation Canal Lock, Southwest Guidewall and Dolphin Replacement &ndash; Phase I, Orleans Parish, LA The work consists of driving six steel pipe pile clusters to hold and support a fut...
Type: MOD | Date: Sep 11, 2018 | Location: 70160-0267 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
322. Construction of the battlefield weather support building, pn 81283 (fy18), ft. carson, co - site visit sign-in sheet
Site Visit Sign-In Sheet for Sol W9128F-18-R-0079 Battlefield Weather Facility, Ft. Carson, CO
Type: MOD | Date: Sep 11, 2018 | Location: 68102-4901 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
323. Green brook segment c2 - amendment 2
EC-101 C-501 Drawings Specifications Amendment 0002 Amendment 0002 is hereby posted.
Type: MOD | Date: Sep 11, 2018 | Location: 10278-0090 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
324. Bonneville auditorium & project office roof & cupola repair - w9127n18b0017 - amendment 3
BDN-6-13 12 these are for information only drawings from 1993.
Type: MOD | Date: Sep 11, 2018 | Location: 97208-2946 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
325. Bonneville auditorium & project office roof & cupola repair - w9127n18b0017 - amendment 2
W9127N18B0017 AMEND 0002 specs Amend 0002 A7 - microbial and asbestos reports The purpose of this amendment is the following: 1. Incorporate Attachment A-7 "Microbial Air Quality Testing Report" in response to bidder inquiries: File Name: A7 - microbial a...
Type: MOD | Date: Sep 11, 2018 | Location: 97208-2946 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
326. Usace-chicago districts ambridge neighborhood sewer rehabilitation in gary, indiana - amendment 2
AMENDMENT 0003 TO SOLICITATION
Type: MOD | Date: Sep 11, 2018 | Location: 60604 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
327. Fy18 repair north drainage, secondary electrical lines and telecommunications, pohakuloa training area (pta), island of hawaii, hawaii - amendment 5
Am-0005 Drawings (Part 2 of 2) Am-0005 Drawings (Part 1 of 2) Am-0005 (Part 2 of 2) Am-0005 (Part 1 of 2)
Type: MOD | Date: Sep 11, 2018 | Location: 96858-5540 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
328. Stx wrought iron fence project - amendment 1
Revised Scope of Work Amendment #1
Type: MOD | Date: Sep 11, 2018 | Location: 00850-9731 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
329. Stx wrought iron fence project - q-a_v-4
Question & Answer Version 4
Type: MOD | Date: Sep 11, 2018 | Location: 00850-9731 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
330. Construct chattooga river work center building on the chattooga river ranger district in rabun county, georgia
Solicitation No. 12531A18R0006 for the Chattooga River Work Center Building on the Chattooga River Ranger District of the Chattahooche-Oconee National Forest in Rabun County, GA is being cancelled in its entirety due to design deficiencies in the specific...
Type: PRESOL | Date: Sep 11, 2018 | Location: 40391 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
331. Boathouse painting
This is the presocitation notice for the NOAA Stellwagen Bank National Marine Sanctuary (NMS) located in Scituate, Massachusetts to repaint the exterior of the existing boathouse building. The requirement includes two optional bid items of 1. fixing the s...
Type: PRESOL | Date: Sep 11, 2018 | Location: 20910 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
332. Connor creek well conversion from windmill to solar
Connor Creek Well Conversion From Windmill to Solar
Type: PRESOL | Date: Sep 11, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
333. Wheatley well conversion from gas to solar
Wheatley Well Conversion From Gas to Solar
Type: PRESOL | Date: Sep 11, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
334. Id pfh 26(4), ketchum-challis highway (avalanche repair) - project description & preliminary plans with transmittal letter
Preliminary Plans Preliminary Letter Project Description PROJECT: ID PFH 26(4), Ketchum-Challis Highway (Avalanche Repair) LOCATION: 17 Miles East of Stanley, ID WORK: The work consists of partial to full removal and replacement of damaged rockfall attenu...
Type: PRESOL | Date: Sep 11, 2018 | Location: 98661-3801 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
335. Install warning signs, 4th cliff - attachment 1- statement of work - attachment 3- signs at 4th cliff - fa2835-18-r-0039-solicition- install warning signs 4th cliff - attachment 2- wage determination - attachment 4- copy of proposal breakdown
Attachment 4- Copy of Proposal breakdown Attachment 2- Wage Determination FA2835-18-R-0039-Solicition- Install Warning Signs 4th Cliff Attachment 3- Signs at 4th cliff Attachment 1- Statement of Work This is for WO #67035, to install warning signs on the ...
Type: PRESOL | Date: Sep 11, 2018 | Location: 01731 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
336. Composting toilet conversion
The toilet building at the Burnt Corral Recreation Area at Apache Lake was operating as a composting toilet until recently. The district wants to change the toilet to a vault toilet due to challenges keeping the composting system functional.
Type: PRESOL | Date: Sep 11, 2018 | Location: 85006 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
337. National labor relations board (nlrb)

Type: AWARD | Date: Sep 11, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
338. Mississippi river, mississippi river, baton rouge to the gulf, head of passes, hopper dredge disposal area project (no. 18&#8208;1), plaquemines parish, louisiana (ed 18&#8208;017)

Type: AWARD | Date: Sep 11, 2018 | Location: 70160-0267 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
339. Niip tunnel 5 replacement of check structure inlet

Type: AWARD | Date: Sep 11, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
340. Usace texas city hurricane flood protection plan (hfpp) erosion repairs, galveston county, texas

Type: AWARD | Date: Sep 11, 2018 | Location: 76102-0300 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
<< Previous  Page 17 of 386  >> 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26   Next >>