FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 5,893 results were found for @Y in 0.236 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 5 of 295  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>
 
81. Emergency maintenance dredging of moriches inlet, new york, federal navigation project - amendment 3
Amendment 0003
Type: MOD | Date: Jun 18, 2018 | Location: 10278-0090 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
82. Clr039b long range discrimination radar construction package #2 ecf, clear afs, ak - specification attachments
01 50 00.02 00 Attachment A 01 19 30.02 29 Attachment G 01 19 30.02 29 Attachment F 01 19 30.02 29 Attachment A
Type: MOD | Date: Jun 18, 2018 | Location: 99506-6898 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
83. Installation of five post tensioned anchors at chickamauga lock - amendment 1
W912P518B0004 Amendment 0001
Type: MOD | Date: Jun 18, 2018 | Location: 37202-1070 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
84. Upgrade liquid hydrogen (lh2) system, launch complex 39b - amendment 8
Amendment 8
Type: MOD | Date: Jun 18, 2018 | Location: 32899 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
85. Inlet wall concrete repairs at franklin falls dam, franklin, nh - solicitation 1
Drawings Specifications Solicitation The U.S. Army Corps of Engineers, New England District is issuing a set aside solicitation for certified small business contractors for the Inlet Wall Concrete Repairs at Franklin Falls Dam, Franklin, NH. The NAICS cod...
Type: MOD | Date: Jun 18, 2018 | Location: 01742-2751 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
86. Chatt-oconee erfo reconstruction (fsr 1227-mp 0.87; fsr 86-mp 6.30; and fsr 153-mp 3.30)
Quotes from certified Small Business Concerns only will be accepted for the Chattahoochee-Oconee National Forest - GA ERFO Reconstruction of FSR 1227, FSR 86 and FSR153, Solicitation Number 12344V18Q0013, located in Oglethorpe and Rabun Counties, Georgia....
Type: MOD | Date: Jun 18, 2018 | Location: 30501 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
87. Chatt-oconee erfo reconstruction (fsr 1227-mp 0.87; fsr 86-mp 6.30; and fsr 153-mp 3.30) - solicitation 1
Attachment 8 - Past Performance Questionnaire Attachment 7 - Relevant Experience Submittal Attachment 6 - FSR 153 & 86 SCHEDULE B: Wage Determination GA180225 01/05/2018 GA225 - Rabun County Attachment 5 - FSR 1227 SCHEDULE A: Wage Determination GA180...
Type: MOD | Date: Jun 18, 2018 | Location: 30501 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
88. Construct stock water pits/reservoirs, valley coun
Construct Stock Water Pits/Reservoirs, Valley County Montana 2018
Type: MOD | Date: Jun 18, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
89. Kings river levee breach repair - amendment 1
Attachment No.: 03 - Davis Bacon Wage Determination dated 15 June 2018 Amendment No.: 01 Amendment No.: 01 is hereby issued.
Type: MOD | Date: Jun 18, 2018 | Location: 95814 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
90. Kings river levee breach repair - solicitation 2
Attachment 03: Davis Bacon Wage Determination Attachment 02: Kings River Specifications Attachment 01: Kings River Plans PL84-99 Kings River Levee Breach Repair Project Request for Proposal: Project Description: This project consists of levee breach repai...
Type: MOD | Date: Jun 18, 2018 | Location: 95814 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
91. The work includes removing and replacing the exist - amendment 0002
140P6218B0004 B09 - Amendment2Attachment11MiscFlagginPict B09 - Amendment2Attachment10ByBuildingsPict B09 - Amendment2Attachment9AlongRoadwayPict
Type: MOD | Date: Jun 18, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
92. The work includes removing and replacing the exist
The work includes removing and replacing the existing water mains, water services lines, gate valves and fire hydrants at Lincoln Boyhood National Monument. This project is for the replacement of all of the asbestos cement water lines located within Linco...
Type: MOD | Date: Jun 18, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
93. Cle elum gate, helix, and intake.
IGF::OT::IGF Cle Elum Dam Fish Passage, Juvenile Facility-Intake Structure, Helix and Gate Chamber, Yakima Project, Washington.
Type: MOD | Date: Jun 18, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
94. Replace roofs at buildings 36 & 2022 - rfi-001
Request For Information
Type: MOD | Date: Jun 18, 2018 | Location: 48045-5213 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
95. Replace roofs at buildings 36 & 2022 - amendment 1 - site visit sign in sheet
Site visit Sign in sheet Site Visit Minutes
Type: MOD | Date: Jun 18, 2018 | Location: 48045-5213 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
96. Sevilleta national wildlife refuge waterline replacement
Sevilleta National Wildlife Refuge Waterline Replacement
Type: MOD | Date: Jun 18, 2018 | Location: 00000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
97. Jerry f. costello lock & dam upstream scour repair kaskaskia river - prebid sign-in kaski scour - clay blanket drawing - package #3
Amendment 2 Clay Blanket Drawing PreBid Meeting Sign-In Amendment 2 for the Kaskaskia Upstream Scouring Repair project is posted. Please ensure a signed copy of the amendment is submitted along with your proposal. There are three (3) attachments with this...
Type: MOD | Date: Jun 18, 2018 | Location: 63103-2833 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
98. Reece road access control point, fort meade, md - amendment 1
AMENDMENT 0001- DRAFT DRAWINGS & SPECIFICATIONS
Type: MOD | Date: Jun 18, 2018 | Location: 21201 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
99. Shadow uas range training facility - solicitation 1
The full Solicitation W912DQ18R4002 is now issued and is available in the Plan Room. See the Instructions to Bidders for the Plan Room Key
Type: MOD | Date: Jun 18, 2018 | Location: 64106-2896 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
100. Ftc terrazzo floor repair and restoration project - amendment 1
The SOLICITATION revised Quantity Matrix RFI Responses PS0002 Amendment 2; 06/18/2018 - is issued to respond to: RFIs submitted Provide Quantity Matrix Revise section; II.D Technical Proposal Factor Descriptions of The Solicitation Revise extend proposal ...
Type: MOD | Date: Jun 18, 2018 | Location: 20407 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
<< Previous  Page 5 of 295  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>