FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 1,037 results were found for @38 in 0.094 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 8 of 52  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>
 
141. Establishing multiple award (ma) categolized idiq for repair and construction of concreate pavements, area iv and kunsan air base (ab). - amendment 1
Amendment 01 for the closing date extension
Type: MOD | Date: Aug 10, 2018 | Location: 00000 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
142. Establishing multiple award (ma) categolized idiq for repair and construction of concreate pavements, area iv and kunsan air base (ab).

Type: MOD | Date: Aug 10, 2018 | Location: 00000 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
143. Establishing multiple award (ma) categolized idiq for repair and construction of concreate pavements, area iv and kunsan air base (ab).
***Note*** For the below project, the two solicitations were issued as the following due to the fund issue and different competition. W91QVN-18-R-0042: Logistics Cost Sharing Funds (LCS) W91QVN-18-R-0058: Operation and Maintenance Funds (O&M) Therefor...
Type: MOD | Date: Aug 10, 2018 | Location: 00000 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
144. Lla - articulating boom lift - solicitation 2
Solicitation
Type: MOD | Date: Aug 10, 2018 | Location: 99362-1876 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
145. Design-bid-build big bear discovery center
Due to time constraints, this project has now been issued as an 8(a) Sole Source award and is currently in solicitation stage.
Type: MOD | Date: Aug 10, 2018 | Location: 96002 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
146. Construction of wood frame engine garage building
Due to time constraints &amp; shortage in acquisition personnel, this project was transferred to Region 6. It was advertised as a SB set-aside under solicitation number 129AB518R0028.
Type: MOD | Date: Aug 10, 2018 | Location: 96002 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
147. C & g intersection upgrades at dla richmond, va - solicitation 1
The Pre-Solicitation number W91236-18-B-0019 was posted in error, it should be Solicitation number W91236-18-B-0009. Please refer to C & G Intersection Solicitation as W91236-18-B-0009.
Type: MOD | Date: Aug 10, 2018 | Location: 23510-1096 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
148. B2048 hvac robins afb
Bldg.2048 UHHZ162026 RFI-1 SOW Pg.3 line1 What percentage of glycol is required in the system? Answer: This work takes place on North side of building 2048, Robins AFB, GA. The basis of design of the new chiller is the 60 Ton Trane CGEN Scroll Chiller (or...
Type: MOD | Date: Aug 10, 2018 | Location: 31098-2700 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
149. B2094 hvac robins afb, ga
Bldg.2094 162025 RFI-1 SOW pg.7 line 5 A The sow calls for new chiller pad. Can we use the existing chiller pad? Answer: No, it needs a new pad. RFI-2 SOW pg.7 line 7 Sow calls to trouble shoot boiler. Do you have the repair information for the boiler. Or...
Type: MOD | Date: Aug 10, 2018 | Location: 31098-2700 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
150. Articulated dump truck rental - solicitation 1
Solicitation W912EK18T0057
Type: MOD | Date: Aug 10, 2018 | Location: 61204-2004 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
151. Green sweeper (636hs) parts - only usa manufacturer authorized seller can participate in bidding. authorization certificate/documentation required with bid.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The solicitation number is PR7517456 and is issued as an invitat...
Type: PRESOL | Date: Aug 10, 2018 | Location: 20521 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
152. Compact multi-terrain loader for bia, dot, ena
333G COMPACT TRACT LOADER FOR BIA, DOT, ENA
Type: PRESOL | Date: Aug 10, 2018 | Location: 00000 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
153. Portable active jib style fall protection system
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The solicitation number is FA462018QA071 and is issued as an inv...
Type: PRESOL | Date: Aug 10, 2018 | Location: 99011 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
154. Articulated dump truck rental
The contractor shall provide a 31 ton capacity articulated dump truck in support of commercial navigation of the inland waterway systems.
Type: PRESOL | Date: Aug 10, 2018 | Location: 61204-2004 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
155. Skidsteer
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are ...
Type: PRESOL | Date: Aug 10, 2018 | Location: 00000 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
156. Capitol interior drive paving

Type: AWARD | Date: Aug 10, 2018 | Location: 20515 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
157. Street sweeper - attachment
Request for Quote (RFQ) #: 36C25918Q9753 (Amendment 1) Street Sweeper This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this no...
Type: FILE | Date: Aug 09, 2018 | Location: 80111 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
158. Tracked excavator
AMENDMENT NOTICE: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The solicitation number is W911S218UEXC2 and i...
Type: MOD | Date: Aug 09, 2018 | Location: 13602 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
159. Multi-purpose excavator
AMENDMENT NOTICE: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The solicitation number is W911S218U1439_01 an...
Type: MOD | Date: Aug 09, 2018 | Location: 13602 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
160. One (1) highcapacity compact street sweeper
AMENDMENT NOTICE: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The solicitation number is W91QV1-18-R-0159 an...
Type: MOD | Date: Aug 09, 2018 | Location: 22060 | Bookmark
Category: (38) Construction, Mining, Excavating and Highway Maintenance Equipment

 
<< Previous  Page 8 of 52  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>