FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

Demolition of Flink Site, Mojave National Preserve

General Information

Document Type:PRESOL
Posted Date:May 23, 2018
Category: Salvage Services
Set Aside:N/A

Contracting Office Address

NPS, PWR - LAKE MABO 601 Nevada Way Boulder City NV 89005-2426 US

Description

Demolition of Flink Site, Mojave National Preserve. The complete solicitation package will be available on or around June 25, 2018. Cleanup will include the demolition and disposal of the six (6) buildings at the Site, the removal and disposal or recycling of the fencing (feet 1,850 of three strand barbed wire fence and 756 feet of chain link fence), the demolition and the disposal of the eight (8) concrete foundations at the Site, and the removal and disposal of the miscellaneous metal debris and solid waste from the site. Grading to match the surrounding contours maybe needed after the removal of the concrete foundations. To ensure that the site has been thoroughly cleaned of debris, the areas that were involved with the demolitions will need to be swept with a magnet to remove all nails, screws, and miscellaneous pieces of metal. The Flink Site is located approximately 200 feet south of the Halloran Summit Road Exit of the north bound lane of Interstate 15 (I-15), which is Exit 265. Asbestos containing materials (ACMs) were found in four (4) of the buildings at this Flink Site and the ACMs are being removed under a separate contract. The ACMs from the 4 buildings must be removed before the buildings can be demolished. There are four additional sites located on MNP that the Park plans to clean-up. The demolition, disposal and cleanup of these sites will be options in this contract.

Original Point of Contact

POC Read, James

Place of Performance

Link: FBO.gov Permalink
Bookmark This Notice
Print View