FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

EC130-J Commando Solo Drawings

General Information

Document Type:AWARD
Posted Date:Oct 11, 2017
Category: Professional, Administrative and Management Support Services
Set Aside:N/A

Contracting Office Address

Department of the Air Force, Air Force Materiel Command, PK/PZ - Robins AFB, 215 Page Rd, Robins AFB, Georgia, 31098-1611, United States

Description

Contract Award Date:         DTD 092717

Contract Award Number:    CNT FA8509-17-P-0002

Contract Award Amount:     AMT $95,078

Contract Line Item Number: LINE ALL

Contractor:     TO L-3 Communication Integrated Systems, 7500 Maehr Rd.<br />, Waco, Texas 76705, United StatesThis sole source acquisition was awarded to L-3 Communication Integrated Systems (CAGE:0GCL4) to procure EC130-J Commando Solo (CS) Special Mission Equipment (SME) Drawing Research and Support. This effort requires L-3 to provide the EC130-J Program office with drawing research capability for SME engineering efforts to resolve technical or supportability deficiencies revelaed in operational service. When a drawing request is made by the EC130-J Program office, L-3s Configuration Analyst will search the drawings from aperture card directories or other databases to locate that particular drawing. Cost Plus Fixed Fee is pricing arrangement. Period of Performance: Basic (30 SEP 2017- 29 SEP 2018) Option 1: (30 SEP 2018- 29 SEP 2019) Option 2: (30 SEP 2019-29 SEP 2020)|**|TO L-3 Communication Integrated Systems, 7500 Maehr Rd.<br />, Waco, Texas 76705, United StatesThis sole source acquisition was awarded to L-3 Communication Integrated Systems (CAGE:0GCL4) to procure EC130-J Commando Solo (CS) Special Mission Equipment (SME) Drawing Research and Support. This effort requires L-3 to provide the EC130-J Program office with drawing research capability for SME engineering efforts to resolve technical or supportability deficiencies revelaed in operational service. When a drawing request is made by the EC130-J Program office, L-3s Configuration Analyst will search the drawings from aperture card directories or other databases to locate that particular drawing. Cost Plus Fixed Fee is pricing arrangement. Period of Performance: Basic (30 SEP 2017- 29 SEP 2018) Option 1: (30 SEP 2018- 29 SEP 2019) Option 2: (30 SEP 2019-29 SEP 2020)|**|TO L-3 Communication Integrated Systems, 7500 Maehr Rd.<br />, Waco, Texas 76705, United StatesThis sole source acquisition was awarded to L-3 Communication Integrated Systems (CAGE:0GCL4) to procure EC130-J Commando Solo (CS) Special Mission Equipment (SME) Drawing Research and Support. This effort requires L-3 to provide the EC130-J Program office with drawing research capability for SME engineering efforts to resolve technical or supportability deficiencies revelaed in operational service. When a drawing request is made by the EC130-J Program office, L-3s Configuration Analyst will search the drawings from aperture card directories or other databases to locate that particular drawing. Cost Plus Fixed Fee is pricing arrangement. Period of Performance: Basic (30 SEP 2017- 29 SEP 2018) Option 1: (30 SEP 2018- 29 SEP 2019) Option 2: (30 SEP 2019-29 SEP 2020)

Original Point of Contact

POC Antwan T. Thomas, Phone: 4789264942

Place of Performance

Link: FBO.gov Permalink
Bookmark This Notice
Print View