FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

HI STP SR11(1) & SR11(2) Hilea & Ninole Stream Bridges

General Information

Document Type:PRESOL
Posted Date:Oct 05, 2017
Category: Construction of Structures and Facilities
Set Aside:N/A

Contracting Office Address

Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228

Description

THIS IS A PRESOLICITATION NOTICE; THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT DETAILS: HI STP SR11(1) and SR11(2) Hilea and Ninole Stream Bridges The Central Federal Lands Highway Division (CFL) of the Federal Highway Administration in partnership with the Hawaii Department of Transportation, is soliciting interest for an upcoming bridge replacement project on the Big Island of Hawaii. The proposed project is located on Mamalahoa Highway (State Route 11), between MP 56.7 (Ninole Bridge) and MP 57.7 (Hilea Bridge) near the Southern tip of the island. The principle bid items include the following: 6500 cubic yards of structural concrete; 730 linear foot of precast, pre-stressed girders, 635 linear foot of precast, pre-stressed concrete slab, 420,000 pounds of reinforcing steel, 6,000 cubic yards of structural excavation; 4,500 cubic yards of roadway excavation; 1400 tons of roadway aggregate; 700 tons of asphalt pavement; Contractor quality control, lump sum; Contractor Testing, lump sum; Construct and Maintain roadway by-pass (two temporary bridges with roadway approaches), lump sum; 6,000 square yard of geosynthetic reinforcement; Removal of Bridge (two bridges), lump sum; and other incidental items of work related to roadway/bridge improvement projects including, soil erosion control, roadway signage and striping, temporary traffic control, and seeding and mulching. It is anticipated that the project will be advertised Mid to late October, 2017. The Notice to Proceed for on-site activity will be issued in January, 2018 at the discretion of FHWA-CFLHD. Estimated total cost is $13 million to $18 million.

Original Point of Contact

POC Sheri Muehl, Phone: 7209633351

Place of Performance

Address:
Mamalahoa Highway, Route 11 District of Kau, Hawaii County, Hawaii, United States
,
Link: FBO.gov Permalink
Bookmark This Notice
Print View