FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

Interior Repairs in Bldg 771

General Information

Document Type:AWARD
Posted Date:Sep 07, 2017
Category: Maintenance, Repair or Alteration of Real Property
Set Aside:N/A

Contracting Office Address

N69450 NAVFAC Southeast, PWD Mid-South 5722 Integrity Drive Building 455 Millington, TN

Description

Contract Award Date:         DTD 090717

Contract Award Number:    CNT N6945017P8016

Contract Award Amount:     AMT 49,466.41

Contract Line Item Number: LINE 0001

Contractor:     TO Frazier Investments Inc (DUNS 063284267)<br />The work includes the renovation of three rooms and incidental related work including the following: 1. The encapsulation, preparation, and abatement of Asbestos Containing Materials (ACMs) in the removal of damaged carpet and gypsum wallboard from floor to wall height of 24 inches in identified areas. 2. Disinfectant/biocide treatment of abated wall and floor surfaces. 3. Disinfectant/biocide treatment and repair of shower stall base. 4. Install new ceramic floor tile base to match existing finish. 5. Construct gypsum board wall surfaces and paint to match existing facility finishes. 6. Furnish and install new carpet and resilient wall base in office and hallway.|**|TO Frazier Investments Inc (DUNS 063284267)<br />The work includes the renovation of three rooms and incidental related work including the following: 1. The encapsulation, preparation, and abatement of Asbestos Containing Materials (ACMs) in the removal of damaged carpet and gypsum wallboard from floor to wall height of 24 inches in identified areas. 2. Disinfectant/biocide treatment of abated wall and floor surfaces. 3. Disinfectant/biocide treatment and repair of shower stall base. 4. Install new ceramic floor tile base to match existing finish. 5. Construct gypsum board wall surfaces and paint to match existing facility finishes. 6. Furnish and install new carpet and resilient wall base in office and hallway.|**|TO Frazier Investments Inc (DUNS 063284267)<br />The work includes the renovation of three rooms and incidental related work including the following: 1. The encapsulation, preparation, and abatement of Asbestos Containing Materials (ACMs) in the removal of damaged carpet and gypsum wallboard from floor to wall height of 24 inches in identified areas. 2. Disinfectant/biocide treatment of abated wall and floor surfaces. 3. Disinfectant/biocide treatment and repair of shower stall base. 4. Install new ceramic floor tile base to match existing finish. 5. Construct gypsum board wall surfaces and paint to match existing facility finishes. 6. Furnish and install new carpet and resilient wall base in office and hallway.

Original Point of Contact

POC Michael Terrell

Place of Performance

Link: FBO.gov Permalink
Bookmark This Notice
Print View