FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

Controls Racks Component Installation - LCLSII-2.7-SW-1062-R0

General Information

Document Type:SRCSGT
Posted Date:Aug 30, 2017
Category: Installation of Equipment
Set Aside:N/A

Contracting Office Address

Department of Energy, SLAC National Accelerator Lab, SLAC National Accelerator Lab, 2575 Sand Hill Road, Menlo Park, California, 94303, United States

Description

SOW for Control Racks Component Installation SLAC National Accelerator Laboratory requires electronic equipment to be installed and wired in equipment enclosures for the Linac Coherent Light Source II (LCLS-II) cryomodule and distribution control system as defined in section 2 Scope. The CONTRACTOR shall manufacture, perform quality assurance, test, package, and deliver the enclosures and auxiliary components in accordance with the requirements of SOW LCLSII-2.7-SW-1062-R0 (see attached) and in the quantities and configuration specified. These racks will have an ultimate destination of SLAC National Accelerator Laboratory.

Original Point of Contact

POC Howard J Wilson, Phone: 6509262769, Dan McCloskey, Phone: 6509262864

Place of Performance

Address:
2575 Sand Hill Road, Menlo Park, California, 94025, United States
94025,
Link: FBO.gov Permalink
Bookmark This Notice
Print View