FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

SHELVING - STORAGE RACKS - location drawing - solicitation

General Information

Document Type:PRESOL
Posted Date:Aug 24, 2017
Category: Materials Handling Equipment
Set Aside:N/A

Contracting Office Address

Department of the Army, Army Contracting Command, ACC - RI (W44W9M) McAlester Contracting Office, Attn: CCRC-IDM, 1 C TREE RD, McAlester, Oklahoma, 74501-9002, United States

Description

shelving-storage racks drawing 1 EACH - SHELVING/STORAGE RACKS - COMPONENTS TO ADD ONE ADDITIONAL RACK LEVEL TO EXISTING RACKS. INSTALLATION IS REQUIRED AND SHALL BE PERFORMED BY VENDOR. ALL ITEMS ARE "OR EQUAL" 4 EACH - UNARCO OR EQUAL, INTERCHANGEABLE SUPPORT BEAM 48", 5314# CAPACITY/PAIR 4 EACH - UNARCO OR EQUAL, INTERCHANGEABLE SUPPORT BEAM 96", 2300# CAPACITY/PAIR 80 EACH - UNARCO OR EQUAL, INTERCHANGEABLE SUPPORT BEAM 85", 2376# CAPACITY/PAIR 40 EACH - UNARCO OR EQUAL, INTERCHANGEABLE SUPPORT BEAM 92", 2300# CAPACITY/PAIR ALL ABOVE COLOR: ORANGE 40 EACH - WIRE DECKS, 36" D X 35" W, 3" CHANNEL, SUPPORTS FOR 1-5/8" STEP BEAM - 2.5 X 4 MESH - WIRE DIA. 6 GA. HOT DIPPED GALVANIZED, CAPACITY 2650# UDL 86 EACH - WIRE DECKS, 36" D X 45" W, 3" CHANNEL, SUPPORTS FOR 1-5/8" STEP BEAM - 2.5 X 4 MESH - WIRE DIA. 6 GA. HOT DIPPED GALVANIZED, CAPACITY 2750# UDL SEE ATTACHED DRAWING 2 EACH - SHELVING/STORAGE RACKS - COMPONENTS FOR ONE SET OF PALLET RACKS. BUILDING WITH 5 BEAM LEVELS. INSTALLATION IS REQUIRED AND SHALL BE PERFORMED BY VENDOR. QUANTITES LISTED ARE FOR TOTAL OF ONE BUILDING. REQUIREMENTS ARE FOR TWO (2) IDENTICAL UNITS THAT WILL BE INSTALLED IN TWO (2) INDIVIDUAL BUILDING LOCATIONS. ALL ITEMS ARE "OR EQUAL" 96 EACH - UNARCO OR EQUAL, ROLL FORM UPRIGHT 10 HIGH X 3 DEEP, 14,003 LB CAPACITY AT 40" BEAM SPACING 20 EACH - 48" BEAM 1 - 2300 LB CAPACITY PER PAIR 20 EACH - 96" BEAM 2 400 EACH - 85" BEAM 3 200 EACH - 92" BEAM 4 192 EACH - SHIMS 192 EACH - ANCHOR BOLTS 200 EACH - DECK 1: WIRE DECKS, 36 D X 35 W, 3 CHANNEL SUPPORTS FOR 1-5/8" STEP BEAM - 2.5 X 4 MESH- WIRE DIA. 6 GA., HOT DIPPED, GALVANIZED, CAPACITY 2650# UDL, 36X35 430 EACH - DECK 2: WIRE DECKS, 36 D X 45 W, 3 CHANNEL SUPPORTS FOR 1-5/8" STEP BEAM - 2.5 X 4 MESH - WIRE DIA. 6 GA., HOT DIPPED, GALVANIZED, CAPACITY 2750# UDL, 36X45 SEE ATTACHED DRAWING

Original Point of Contact

POC Kent W. Hackett, Phone: 9184206177

Place of Performance

Link: FBO.gov Permalink
Bookmark This Notice
Print View