FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

Replace Pumps and Motors at Wells - Draft Statement of Work

General Information

Document Type:PRESOL
Posted Date:Aug 23, 2017
Category: Plumbing, Heating and Sanitation Equipment
Set Aside:N/A

Contracting Office Address

Department of the Air Force, Air Education and Training Command, 502d Contracting Squadron, 1655 Selfridge Avenue, JBSA Lackland, Texas, 78236-5253, United States

Description

Draft Statement of Work PROJECT SCOPE Well #1 Above Ground Pump: The contractor shall furnish all supervision, labor, transportation, materials, tools, incidentals, equipment, personnel and other services necessary to replace above ground pump. Contractor shall remove old steel piping in well #1, Diameter -12 inches and replace with new steel pipe 320 feet with 7 stages along with 150 horsepower motor, speed-1770 RPM Phase-3 Voltage-460V. The pump will be tested to ensure proper operation before acceptance. Contractor shall disconnect and connect all the piping and 7 stage and all the plumbing with electrical. In addition, all services shall be performed in accordance with the latest version of the Uniform Building Code, International Building Code (IBC), Federal, State, local building codes and Texas Administrative Code (Title 30, Part 1, Chapter 334, Subchapter C, Rule 334.49). PROJECT SCOPE Well #5 Submersible Pump : The contractor shall furnish all supervision, labor, transportation, materials, tools, incidentals, equipment and personnel and other services necessary to replace submersible pump. Contractor shall remove old steel piping in well # 5 Diameter-14 inches and replace with new steel pipe 272 feet with 4 stage along with 200 horsepower motor, speed-1750 RPM Phase-3 Voltage-460V. The pump will be tested to ensure proper operation before acceptance. Contractor shall disconnect and connect all piping, submersible 4 stage and all the electrical. Contractor shall install all new pump with pipe and electrical

Original Point of Contact

POC Jack A. Caniglia, Phone: (210)671-1721, Timothy J. Hull, Phone: (210)671-1717

Place of Performance

Address:
Building 2194 and Building 3186, Joint Base San Antonio, Fort Sam Houston TX, San Antonio, Texas, 78234, United States
78234,
Link: FBO.gov Permalink
Bookmark This Notice
Print View