FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

Fort Randall Floating Dock - Specifications

General Information

Document Type:PRESOL
Posted Date:Aug 18, 2017
Category: Ships, Small Craft, Pontoons and Floating Docks
Set Aside:N/A

Contracting Office Address

Department of the Army, U.S. Army Corps of Engineers, USACE District, Omaha, Attn: CENWO- CT, 1616 Capitol Ave, Omaha, Nebraska, 68102-4901, United States

Description

Dock Specifications Vendor shall provide to the Ft. Randall Project a new floating dock. Vendor is responsible for all costs of delivering the dock to the Ft. Randall Project. The work covered under this section shall consist of manufacturing and/or supplying of the floating dock sections, gangway, pile guides, fendering, and other marine hardware and accessories as may be shown or enumerated on the plans. All materials shall be manufactured as described and shown in drawings, or engineered equivalent.

Original Point of Contact

POC Jeannette K Patton, Phone: 6054877845

Place of Performance

Address:
USACE-Fort Randall Project, 113 Randall Creek Road, Pickstown, South Dakota, 57367, United States
57367,
Link: FBO.gov Permalink
Bookmark This Notice
Print View