RESTRICTED SEARCH
This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.
Connectorassembly,
Proposed procurement for NSN 1280011872145 CONNECTORASSEMBLY,: Line 0001 Qty 00044 UI EA Deliver To: SU TRANSPORTATION OFFICER By: 11-MAR-09Approved source is 04577 3603-0022-1. The solicitation is an RFQ and will be available at the link provided in this...
Type: PRESOL | Date: Nov 15, 2007 | Location: 23297-5789 |
Bookmark
Category: (12) Fire Control Equipment
Case, optical spotting
Proposed procurement for NSN 1240006546089 CASE, OPTICAL SPOTTING: Line 0001 Qty 00323 UI EA Deliver To: TRANSPORTATION OFFICER within 90 days ADOApproved sources are 65534 X01503; 7A004 6546089. The solicitation is an RFQ and will be available at the lin...
Type: PRESOL | Date: Mar 20, 2008 | Location: 43216-5010 |
Bookmark
Category: (12) Fire Control Equipment
4.
Op#3 office space upgrade
To renovate OP-3 and build new office space in OP-3. To accommodate the personnel who will be working oat OP-3. To support existing, as well as, new programs. This rebuild will include a renovation of HVAC systems, electrical and communication systems upd...
Type: PRESOL | Date: Mar 20, 2008 | Location: 00000 |
Bookmark
Category: (12) Fire Control Equipment
Op 3 rest room upgrade
This project will entail renovatin the men's and women's room in OP-3. The project scope will incluse new wall and floor coverings, new piping in the walls and new plumbing fixtures in each bathroom. This project will alson include new lighting fixtures, ...
Type: PRESOL | Date: Mar 20, 2008 | Location: 00000 |
Bookmark
Category: (12) Fire Control Equipment
7.
Op 1 and op 2 power transition phase ii
This project consists of adding electrical support equipment for OP-1 and OP-2. These systems will include buying and installing various pieces of equipment (UPS systems, soft starts, generators, etc). The more critical areas in the building, including th...
Type: PRESOL | Date: Mar 20, 2008 | Location: 00000 |
Bookmark
Category: (12) Fire Control Equipment
8.
Address the security issues around op-1/op-2/op-3
During a recent security audit conducted by the local PMO office, serveral secuity issues were found. One finding was the fact that the doors on the perimeters of each building cannot be secured at night. To addresthis issue, this project will add access ...
Type: PRESOL | Date: Mar 20, 2008 | Location: 00000 |
Bookmark
Category: (12) Fire Control Equipment
9.
Modulator,radar
Proposed procurement for NSN 1285013957509 MODULATOR,RADAR: Line 0001 Qty 00004 UI EA Deliver To: DEF DIST DEPOT SAN JOAQUN within 280 days ADOThis item contains one or more components that must meet qualified products list (QPL) specifications. The solic...
Type: PRESOL | Date: Mar 21, 2008 | Location: 43216-5010 |
Bookmark
Category: (12) Fire Control Equipment
10.
Trijicon project
For assistance with broken links contact the Point of Contact in this notice or the FBO Help Desk at 877-472-3779.
Type: FILE | Date: Mar 24, 2008 | Location: |
Bookmark
Category: (12) Fire Control Equipment
11.
Ansi calibration kit, model 8650e14
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals a...
Type: PRESOL | Date: Mar 24, 2008 | Location: 00000 |
Bookmark
Category: (12) Fire Control Equipment
Control, indicator
Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers that have successfully completed all testing required by the original company responsible...
Type: SRCSGT | Date: Apr 10, 2008 | Location: 73145-3015 |
Bookmark
Category: (12) Fire Control Equipment