FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

<< Previous  Page 16 of 78  >> 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25   Next >>   All
 
1501. Paving (idiq) - solicitation 1
1502. Herbert hoover dike rehabilitation, structure replacements s-288 (hp-1) reconstruction, glades county, florida - amendment 5
1503. Dixie national forest - brianhead fire - fence installation project - sf-18
1504. Dixie national forest - brianhead fire - fence installation project - solicitation 1
1505. Replace fire alarm system sablich center - amendment 2
1506. Replace compressors for constant temperature rooms in the nlgrp
1507. Western regional multiple award construction contract (macc)
1508. Repair earth covered magazines (ecms) in ammunition holding area (aha) no. 20, camp casey. - w91qvn18r0109
1509. Us embassy dakar annual maintenance service of the photovoltaic system
1510. Structural repair and lighting upgrade - sow
1511. Structural repair of concrete basin rbl 2, hohenfels
1512. Cuva roofing projects - 8 locations
1513. Roofing and painting
1514. Replace heating- and hot water boiler systems at building 670, hohenfels militar community, germany
1515. Thomas jefferson building exterior handrails, ground floor entrance, west main pavilion, washington dc
1516. Repair lift station - rfq
1517. Grounds renovation, allen bible visitor center, lake mead nra
1518. Roof repair and sealant
1519. Roofing replacement - norman a. berg national plant materials center, beltsville, md
1520. 5th floor water mission area (wma) conference area renovation
1521. Olmsted lock and dam elevator heater installation
1522. Bldg 211 roof repair
1523. Two single award idiq term contracts for small construction projects in wva & ky - package #1
1524. Renovate building 2007
1525. Dixie national forest - brianhead fire - fence installation project
1526. Shore protection project, duval county, florida, beach renourishment 2018
1527. Painting exterior window trim inlcudes lead based paint removal
1528. Repair ccr - solicitation
1529. Waterfront repairs, coast guard station gloucester, ma
1530. Repair bulkhead at us coast guard cutter diligence moorings in wilmington, nc
1531. Source sought for saint elizabeth west campus operations and maintenance
1532. Replace bldg. 51 chiller - sources sought information request form
1533. Energy conservation improvement program (ecip) for repair/retrofit lights multiple buildings, edwards afb, ca. phase 3
1534. Dredging savannah habor - sources sought
1535. Correct water infiltration issues at netpop/telecom vault, and vaults at 11 w quincy, 230 s state st.
1536. Painting idiq requirements - package #1
1537. Nlgrp rack project - ground floor plan south revisions 1990 nssl 0039 (2) 20180417
1538. Market reseach for multiple award construction contracts (macc) - market research
1539. Miscellaneous roof repairs and roof coating bldg. 303 nsa-mechanicsburg, pa
1540. Roof repairs/replacements-bicy
1541. Fresno p&dc, ca security upgrades
1542. Repair pool deck paint b3957
1543. Replace 480v conductors at load center 4 located at portsmouth naval shipyard
1544. Excavation for water storage tanks at stovepipe we
1545. Tus courtroom a/v construction infrastructure
1546. Replace 24 inch potable water pipe and valve
1547. Fy18 pn 87957, dredge wharves b0001-b0005, naha port, japan
1548. Project no. 42a-0125307p, replace ups system in building 1026, usag bavaria, grafenwoehr military community - tower barracks, germany
1549. Intrusion detection system 2d200
1550. The work includes, but not limited to: the renovation work of the approximately 500 square foot bath house includes the demolition of existing plumbing and electrical systems and architectural finish
1551. Multiple renovations
1552. Install security fencing around critial utilities
1553. Microbial remediation services
1554. Headquarters sidewalk and curb replacement
1555. Rr465 electrical upgrades
1556. Nolin river lake mowing & maintenance idiq - 2018
1557. Reshingle roofs, bldgs 101 and 1308
1558. D-b renovate public health institute laboratory, skopje, macedonia - attachment
1559. Nrm midwest district. project # 852-18-102 remove and replace concrete walkway and expansion joint sealant. 2 nrm projects combined to one (852-18-102 and 852-18-103)are nrm 852-18-102. subject to availability of fy18 funds. - solicitation 1
1560. Nrm midwest district. project # 852-18-102 remove and replace concrete walkway and expansion joint sealant. 2 nrm projects combined to one (852-18-102 and 852-18-103)are nrm 852-18-102. subject to availability of fy18 funds. - attachment
1561. Track and rail maintenance at portsmouth naval shipyard, kittery, maine - amendment 2
1562. Install cctv cameras - amendment 1
1563. Repair b500 flood damage - justification and approval (j&a)
1564. Asbestos containing floor tile and mastic abatement vacchcs 2615 e. clinton ave, fresno ca - solicitation 1
1565. Fisher house sign and accessible route - amendment 2
1566. Caco biolab floor tile installation - solicitation 1
1567. Renovate building 2-medical surgical 659-17-101 - attachment
1568. Upgrade perimeter fence - attachment
1569. Essex county airport replacement of the runway 22 localizer shelter, caldwelll, nj - attachment
1570. Project number 695-18-119 fy18 tjc and safety corrections (va-18-00044518) - amendment 2
1571. Chain link fence - ci pop: 05/14/2018 to 05/31/2018 - amendment 2
1572. Idiq satoc | electrical - attachment
1573. Idiq satoc | hvac & plumbing - attachment
1574. Chain link fence - ci pop: 05/14/2018 to 05/31/2018 - attachment
1575. Install new tidal slough barrier float system - amendment 1
1576. Repair fire protection pipeline at hario shima ordnance - attachment
1577. Repair fire protection pipeline at hario shima ordnance, track-1 - attachment
1578. Service-engineering service- gaylord hood cleaning - attachment
1579. Replace elevators - amendment 1
1580. Connect oil/water separator (ows) discharge to sew er system - w90vn7-18-r-0014
1581. Replace non-compliance usts with asts - w90vn7-18-r-0017
1582. Internal and external preparation and painting of various buildings - amendment 1
1583. Road construction matoc - solicitation 1
1584. Rubber removal and line striping at jb mdl
1585. Xb443-0.4 bartlett aop culvert replacement over tributary to albany brook - amendment 1
1586. Xb443-0.4 bartlett aop culvert replacement over tributary to albany brook - 12148418r0002 xb443-0.4 revised q-a 041818
1587. Rebuild menominee pier light 6 - amendment 2
1588. Fire sprinkler upgrades, hale boggs federal building, new orleans, la - amendment 1
1589. Anthony j. celebrezze- vending room paint project - amendment 1
1590. Anthony j. celebrezze-vending room flooring project - amendment 1
1591. Mntgp road and railbed obliteration - amendment 1
1592. Harbor dredging - amendment 1
1593. Elevator maintenance - amendment 10
1594. Muir woods lift stations rehabilitation project
1595. Ventilation fans for timber paint storage buildings - amend1 ventilation fans for timber paint storage buildings
1596. Ria viaduct bridge repair - 18r5005 appendix 1 dwgs
1597. Ria viaduct bridge repair - package #1
1598. Railroad bed removal - amendment 1
1599. Repair water tower at fci mendota - solicitation 1
1600. Caco biolab floor tile installation
<< Previous  Page 16 of 78  >> 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25   Next >>   All